Article – RCAP https://www.rcap.org Tue, 14 Dec 2021 14:40:41 +0000 en-US hourly 1 https://wordpress.org/?v=6.4.3 https://www.rcap.org/wp-content/uploads/2021/11/cropped-website-favicon-logo-32x32.png Article – RCAP https://www.rcap.org 32 32 Water and Wastewater Revolving Loan Fund (RLF) Uses https://www.rcap.org/resources/financial-assistance-information/ https://www.rcap.org/resources/financial-assistance-information/#respond Wed, 09 May 2018 15:22:48 +0000 https://rcapinc.wpengine.com/?post_type=resources&p=14909 The funds available through RCAP’s Water and Wastewater Revolving Loan Fund (RLF) can be used for: pre-development expenses necessary to secure permanent financing for major capital improvements, or funding for small capital improvement projects to preserve, improve, or enhance the services of the system. Such improvement projects may include funding for: water and/or wastewater treatment […]

The post Water and Wastewater Revolving Loan Fund (RLF) Uses appeared first on RCAP.

]]>
The funds available through RCAP’s Water and Wastewater Revolving Loan Fund (RLF) can be used for:

  • pre-development expenses necessary to secure permanent financing for major capital improvements, or
  • funding for small capital improvement projects to preserve, improve, or enhance the services of the system.
    • Such improvement projects may include funding for: water and/or wastewater treatment plant improvements and upgrades, sewer-line extensions to existing unsewered properties, water-line extensions to unserved properties, water storage facility improvements, equipment purchases and much more.

The fund is a national service of RCAP but is managed by one of the regional partners in the RCAP network – Communities Unlimited, the Southern RCAP. For more information, please visit their website – https://communitiesu.org/

The post Water and Wastewater Revolving Loan Fund (RLF) Uses appeared first on RCAP.

]]>
https://www.rcap.org/resources/financial-assistance-information/feed/ 0
10 Tips to Help Communities Hire An Engineer https://www.rcap.org/resources/ten-tips-to-help-communities-hire-an-engineer/ https://www.rcap.org/resources/ten-tips-to-help-communities-hire-an-engineer/#respond Wed, 22 Feb 2012 06:49:29 +0000 https://rcapinc.wpengine.com/?post_type=resources&p=15051 This list was developed by Great Lakes RCAP. A couple of the points speak of the situation in Ohio, but the tips can be applied in other states as well.   Know what your project is before you begin. Communities should develop a detailed project summary that specifically states what the problem is that needs […]

The post 10 Tips to Help Communities Hire An Engineer appeared first on RCAP.

]]>
This list was developed by Great Lakes RCAP. A couple of the points speak of the situation in Ohio, but the tips can be applied in other states as well.

 

  1. Know what your project is before you begin. Communities should develop a detailed project summary that specifically states what the problem is that needs to be solved, a narrative describing their existing facilities, and ideas the community has for solving the problem (i.e., potential sites where infrastructure could be located, type of infrastructure preferred, etc.).
  2. Establish a qualified engineer selection committee that will review qualifications, conduct interviews, and recommend a firm to the legislative body. Use existing community resource people in your area. These could include the sanitary engineer for your county, local community and economic development staff, a contractor or person who understands water and/or wastewater projects that resides in your community, your local water/wastewater superintendent, your village administrator, members of the board of public affairs, your CEO, your CFO, or members of your legislative body who have experience with water and/or wastewater projects.
  3. Develop a unique RFQ that challenges engineering firms to do some work in order to meet the requirements of the RFQ. Don’t just use the same RFQ sample that engineers are used to or you will get the same information they send to all clients. An example might be to challenge engineers to provide a one-page summary of recommendations as part of their qualifications on how to solve the problem you are seeking engineering services for in the first place.
  4. Request in the RFQ that engineering firms provide to you a list of all water/wastewater projects they have worked on in the past 5 years. This approach is more effective than asking for three references because you will have a list of all their projects not just the projects that were successful.
  5. Insist that engineers meet with village officials (village administrator, water or wastewater superintendent, etc.) and conduct a preliminary tour of the community and project site before submitting their qualifications.
  6. Develop a list of interview questions that focuses on the type of project you need to complete. Don’t just use interview questions that engineers hear at each interview they attend. Be creative and ask questions that will challenge engineers to think “on their feet.” Communities must remember that at no time during the RFQ or interview process are they allowed to ask about the cost of services. The Ohio Design Professional Selection Law clearly states that costs for services cannot be discussed until firms have been evaluated and ranked accordingly using Qualifications-Based Selection criteria.
  7. Don’t try to interview too many firms and make sure you provide adequate time for the interviews. Generally, 3-5 firms should be the maximum number of firms that a community interviews. Conduct the interviews consecutively in one day and allow enough time to successfully determine if each firm has what you are looking for. Interviews should be no less than 30 minutes each and should be scheduled to allow for a brief presentation by each firm followed by questions from the community.
  8. Make it clear to engineering firms that you want the project manager that would be working on your project to attend the interview. It is very important that communities get a feel for what the project manager is like, his/her demeanor, does he/she listen to you during the interview, etc. The most important mental question during the interview should be Can we work as a team with this person (the project manager)?
  9. Advertise the RFQ as much as possible. Send the RFQ to a large newspaper not just your local newspaper. Use the F.W. Dodge to advertise your RFQ. Talk with the communities around you and ask them who they have worked with in the past and send the RFQ to those engineering firms. Send the RFQ to firms that have visited with your local officials in the past. Get a list of engineers from the Consulting Engineers Council of Ohio and select firms near your area to send the RFQ to.
  10. Communities should remember that they are not required to enter into contract with the firm that is ranked the highest after the interviews are conducted. If a community cannot reach an agreement with the highest ranked firm in regards to the cost of their services; they need to remember that the law states that they can negotiate with the second ranked firm, then the third ranked firm, etc. until the community is able to negotiate a fair price with a firm. If the community cannot reach an agreement with any of the firms interviewed, they must begin the entire process over.

The post 10 Tips to Help Communities Hire An Engineer appeared first on RCAP.

]]>
https://www.rcap.org/resources/ten-tips-to-help-communities-hire-an-engineer/feed/ 0
Natural Disaster Preparedness Guidelines for Water and Wastewater Utilities https://www.rcap.org/resources/natural-disaster-preparedness-guidelines-for-water-and-wastewater-utilities/ https://www.rcap.org/resources/natural-disaster-preparedness-guidelines-for-water-and-wastewater-utilities/#respond Tue, 17 Jan 2012 06:52:03 +0000 https://rcapinc.wpengine.com/?post_type=resources&p=15053 The U.S. Environmental Protection Agency’s Water Security Division has developed a checklist to assist water and wastewater utilities in natural disaster readiness, with a focus on hurricane preparedness. Whether you live and work in a Hurricane Zone or along Tornado Alley, it is important to recognize that time is of the essence when severe weather […]

The post Natural Disaster Preparedness Guidelines for Water and Wastewater Utilities appeared first on RCAP.

]]>
The U.S. Environmental Protection Agency’s Water Security Division has developed a checklist to assist water and wastewater utilities in natural disaster readiness, with a focus on hurricane preparedness.

Whether you live and work in a Hurricane Zone or along Tornado Alley, it is important to recognize that time is of the essence when severe weather comes your way. Water and wastewater utilities will want to remain in operation for as long as possible and return to operation as rapidly as possible following a severe storm situation. To make this possible, utilities should consider implementing the following steps in preparation for severe weather conditions.

A. General:
1. Line up and schedule emergency operations and clean up crews.
2. Notify State and Federal Agencies (FEMA and others) of location and telephone numbers of the emergency operating center or command post for the utility. For public water systems, be sure to line up contacts to request emergency water supply, if necessary.
3. Notify media where to access information and press advisories.
4. Arrange for food and water for the crews.
5. Notify and set up clear lines of communication with local authorities, such as police and fire in case of an injury or other emergency.
6. Make arrangements with the local power utility to be prepared to disconnect power to the plant if plant is evacuated or if power lines are downed and to restore power as a primary customer.
7. Make arrangements with local companies to purchase materials and supplies and to borrow/lease heavy equipment needed to make repairs to the plant.
8. Make arrangements with local companies to have materials and chemicals delivered to the plant as soon as it is safe and units are repaired and ready for operation.

B. Grounds and Common Areas:
1. Check inventory of emergency repair equipment and supplies (i.e., sand and sandbags, hand shovels, power equipment, fuel, batteries, flashlights, portable radio, first aid kits, etc.). Resupply if possible.
2. Stock service vehicles with equipment and supplies.
3. Fuel all vehicles and emergency generators.
4. Move service vehicles to high ground (above expected flood crest).
5. Check all communications equipment and charge or replace batteries (i.e., two-way radios, cell phones, walkie-talkies, pagers, etc.).
6. Sandbag critical areas.
7. Board up critical windows and doors to prevent wind damage.
8. Shut down exposed pipes at river crossings to prevent discharge of raw sewage or to prevent loss or contamination of potable water if the pipes break.

C. Administration and Laboratory Buildings:
1. Remove portable electrical equipment and small motors from the flood zone.
2. Remove all sensitive laboratory equipment from the flood zone, where possible.
3. Remove or store computers in a safe area.
4. Remove or store all important records in a safe area.
5. Move vital records such as built drawings, wiring diagrams, etc. to the emergency operations center or command post.
6. Remove or store furnishings in a safe place, when practical.
7. Disconnect electrical power to the building if it is evacuated.

D. Treatment Plant and Pumping Stations:
1. Fill empty tanks with water to prevent floating.
2. Disconnect power to all units in the flood zone. Have the power utility disconnect power to the entire plant, if ordered to evacuate the facility.
3. Remove or move chemicals to a safe area. If chemicals are removed from an underground or above-ground tank, fill the tank with water to prevent floating.
4. Remove fuel from underground tanks to prevent contamination of the fuel and to protect the environment. If possible move above-ground fuel storage tanks to a safe area (fuel will be need for emergency and plant vehicles until new supplies arrive. If it is not practical to move above-ground fuel storage tanks, remove the fuel and fill tanks with water.
5. Remove electrical motors, where possible.
6. When it is not practical to remove large motors, wrap the motors in plastic and seal as tight as possible. This will not keep the motor from getting wet, but will protect the motor from silt, mud, and dirt getting into the windings. Submerged motors can be washed with clean water and dried, and in most cases restored to service.
7. Remove shop tools and electrical hand tools to the emergency operations center or command post.
8. For drinking water systems, as appropriate, try to have elevated storage at full capacity.

After the Storm

Recognizing that water and wastewater facilities will want to restore and /or maintain operations as quickly as possible following a storm, the EPA recommends the following steps after the skies have cleared.

A. General:
1. For water systems, the first priority should be restoring fire flow and pressure.
2. For wastewater utilities, the first priority should be to restore primary treatment and disinfection.
3. Line up and schedule emergency operations and clean up crews.
4. Make arrangements with the local power utility to repair and restore power to the plant as a primary customer. Power should not be turned on to buildings or process units until the flood water or other debris have been removed and the area is safe to occupy.
5. Notify state and federal agencies when the facility is back in operation.
6. Notify the media where to access information and press advisories, such as boil water orders, beach closures, and other public instructions.
7. Make arrangements with local companies to deliver materials and chemicals as soon as it is safe, and facilities are prepared and ready for operation.
8. Make arrangements with local companies to deliver materials and supplies and to provide heavy equipment needed to make repairs to the plant.
9. Contact state and local authorities to determine if there are any restrictions on the disposal of materials and debris removed from the site or if a temporary discharge permit (NPDES or other) is needed for the water pumped from tanks and other flooded or damaged structures.

B. Grounds and Common Areas:
10. Inspect all service vehicles for water and wind damage.
11. Check site including remote locations for visible damage to power lines and above ground structures.
12. Inspect all sewage collection systems for damage and blockages. Most collection systems will require cleaning after a flood.
13. Inspect all exposed pipes, especially at river crossings, for leakage. Broken pipes can discharge raw sewage into rivers and streams. Broken water pipes, including service connections to severely damaged structures, can provide a source of contamination and/or pressure loss to the potable water system.
14. Check all remote control systems, including telemetering, telephone and other systems.

C. Administration and Laboratory Building:
15. Check windows and doors for wind damage. Replace and repair as needed to prevent further damage and to provide security.
16. Check roofs for water and wind damage. Make repairs as needed to prevent further damage.
17. Pump out and remove silt, mud, and sand from basements and other below grade areas.
18. Clean and disinfect masonry walls with bleach solution to prevent the growth of mold and mildew.
19. Remove all plasterboard, wallboard, and sheet rock that are wet or shows signs of water damage. Clean and disinfect all the interior studs and other support structures behind the damaged walls with bleach solution to prevent the growth of mold and mildew.
20. Inspect all switch gear, motor control centers, electrical boxes, junction boxes and other electrical equipment in flooded areas for silt and sand or loose connections. Boxes should be cleaned and dried with portable or hand held dryers before electrical power is restored.
21. Thoroughly clean all wet carpets. It is advisable to remove carpets for cleaning. If removing the carpets is not practical, carpets should be steam cleaned, disinfected and mechanically dried. The carpets should also be treated with an anti-bacterial agent to prevent the growth or mold or mildew.
22. Check and reset fire alarms, door alarms, clocks and other control measurement devices.
23. Start sampling, monitoring and testing, including the water distribution system for coliform bacteria as soon as the laboratory is operational.

D. Treatment Plant and Pumping Stations:
24. Pump out all tanks, wet wells, dry wells, channels, vaults and pits to remove silt, mud, sand and debris. In some cases, washing down walls will be necessary before returning to service. Make sure you have all the necessary permits to dispose of the collected material and for discharging wastewater.
25. Inspect all equipment, clean and lubricate.
26. Inspect all switch gear, motor control centers, electrical boxes, junction boxes and other electrical connections in flooded areas for silt and sand or loose connections. Boxes should be flushed with fresh water and dried before electrical power is restored. Breaker boxes and other contacts may need additional cleaning to remove corrosion, especially if the damage was caused by salty or brackish water.
27. Inspect all electric motors. Generally, it is more cost-effective to replace small flood damaged motors than to try and repair them. In some cases, motors can be flushed with de-ionized water. Be sure motor is thoroughly dry before restoring power. Starters and other electrical controls may also be damaged and will need to be replaced.
28. Large motors that were not removed but were wrapped in plastic should be inspected for damage. Be sure the motor is thoroughly dry before restoring power. However, having the motors cleaned and dried by motor or armature specialists is recommended. Starters and other electrical controls may also be damaged and need to be replaced.
29. Large horsepower motors that were not wrapped in plastic should be removed and sent out for cleaning and drying. Check with the motor and armature specialists in your area. They will often have equipment to clean and ovens designed to dry motors under controlled temperatures.
30. Inspect and clean debris from all air intakes and vents.
31. Inspect all chemical storage and feed equipment to male certain that the equipment is undamaged and is properly calibrated.
32. Chemical and fuel tanks that were filled with water should be pumped our ant restocked with fresh materials. Caution: Water from fuel tanks may still contain hydrocarbon residues and may require special handling and disposal.
33. Check and refuel emergency generators in preparation of future power outages. If generators and diesel fuel engines have been flooded, they will need to be overhauled or have the engines rebuilt. Getting emergency power capability restored should be a high priority. Renting portable generators or pumps should also be considered.